Skip to main content

SP_InactiveSites Job

This job highlights your environments least active Sites or Site Collections.

Analysis Tasks for the SP_InactiveSites Job

Navigate to the Jobs > SharePoint > 7.Activity > Usage Statistics > SP_InactiveSites > Configure node and select Analysis to view the analysis tasks.

warning

Do not modify or deselect the selected analysis task. The analysis task is preconfigured for this job.

Analysis Tasks for the SP_InactiveSites Job

The default analysis task is:

  • Inactive Sites Last 30 Days – Creates the SA_SP_InactiveSites_Last30Days table accessible under the job’s Results node

In addition to the tables and views created by the analysis tasks, the SQL_InactiveSites Job produces the following pre-configured report:

ReportDescriptionDefault TagsReport Elements
Inactive SitesThis report identifies Sites that have not had activity for at least 30 days. [View], [Delete], [Update], [Delete] fields reflect the number of unique operations of each type that was performed on the inactive site for this time frame.NoneThis report is comprised of two elements:
  • Bar Chart – Displays information on inactive sites
  • Table – Provides details on inactive sites